• English
  • فارسی

SBSHQ

English

Details

Client

Type of Project

Description

Aim: Trace a probable oil spill due to an accidental cut of a loading arm
Project: Harra Qeshm Oil Jetty
Study area: Clarence Strait between Bandar Abbas and Laft-Pohl passage
Forcings: 5m tidal range, waves, wind
Findings: Mangrove area is safe until 48 hours after the probable accident

Details

Client

Type of Project

Description

Location: Northern coast of Qeshm Island
Design Vessel(s): 70000 DWT tankers, and 7000 DWT various types of vessels
Access road: 1380m(rubble mound) and 580m (deck on pile)
Berths: dolphin type at two sides of the jetty
Un/Loading facilities: 4 loading arms
Delivery: various pipes laid on pipe racks
Water intake capacity: 100.000 m3/d

Details

Client

Type of Project

Description

location: northern coast of Qeshm Island
Design Vessel(s): 70000 GT tankers, and 7000 GT various types of vessels
Access road: 700m (rubble mound) and 500m (deck on pile)
Berths: dolphin type at two sides of the jetty
Un/Loading facilities: 4 loading arms
Delivery: various pipes laid on pipe racks